The Red Line rail project was developed for the people in Bangkok’s Metropolitan Region. It is one of the latest initiatives by the State Railway of Thailand (SRT) in mitigating traffic and air pollution issues in the city.
This is part of the Mass Rapid Transit Master Plan to encourage urban rail among commuters. As this project is catered to a high volume of traffic every day, a functional and long-lasting structure was required.
At Lysaght, there is something to suit each building’s design. As a specialist in manufacturing steel roofing, wall cladding, guttering, fascia, steel fencing, purlins and structural formwork, we are committed to delivering high-quality solutions that can last a long time.
Flexibility is key in achieving the Red Line’s project design. This is where LYSAGHT® ULTIMA HI-RIB® was able to fulfil its design requirements with the help of our unique roll-on-site service.
Developed for the frequent rainfall conditions in Asia, LYSAGHT® ULTIMA HI-RIB® offers superior roof drainage and water tightness capabilities. Other than its practicality and durability, this profile also highlights the Red Line project attractive roof lines.
Apart from that, the ULTIMA HI-RIB® is also made for easy installation. The long, straight lengths of the profile can be aligned and installed quickly, resulting in lesser work time. For quality assurance, we have also tested at a NATA-registered laboratory.
Manufactured with premium BlueScope materials such as ZINCALUME® steel, our profiles guarantee a good performance at all times.
NS BlueScope Lysaght Thailand provided the roofing solutions for this key government project in Bangkok.
NS BlueScope Thailand supplied roofing solutions for the construction of highly-anticipated MRT Line.
The Electrical Train Purple Line Project Maintenance Center sports a stylish design that calls for modern curve levels; which is why Lysaght solutions were chosen to fit into its unique architectural design.